1 |
05-Jul-2025 09:00 AM |
17-Jul-2025 12:00 PM |
18-Jul-2025 03:00 PM |
[Supply of Gear boxes geared motor for OBMS ILMS of various conveyors at coal handling plant KSTPS,Kota]
[20229][2025_RRVUN_485322_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
2 |
04-Jul-2025 06:30 PM |
14-Jul-2025 04:00 PM |
15-Jul-2025 11:00 AM |
[TN-18333]
[TN-18333][2025_RRVUN_485194_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
3 |
04-Jul-2025 11:00 AM |
15-Jul-2025 03:00 PM |
16-Jul-2025 03:30 PM |
[Annual contract for smooth work of handling of store material i.e. assistance in loading / unloading, proper cleaning, tagging/restacking, physical verification preparation of SRN and SIN, operation of diesel pump and weigh bridge, cleaning of store ]
[645/2025-26/XEN-STORE/CTPP][2025_RRVUN_475993_2]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
4 |
04-Jul-2025 09:00 AM |
10-Jul-2025 11:30 AM |
11-Jul-2025 11:00 AM |
[Requirement of Marsh Automation make Three Phase Electrical Actuators and Spares for Flap Gate, Flow Divider and R. P. Gate at CHP, SSCTPS, Suratgarh.]
[TN-SC-02/2025-26/CHP][2025_RRVUN_484882_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||Dy.CE (CHPl) |
5 |
03-Jul-2025 03:00 PM |
10-Jul-2025 11:00 AM |
11-Jul-2025 11:00 AM |
[TN-SC-Prop.-01 (CnI)/2025-26]
[TN-SC-Prop.-01 (CnI)/2025-26][2025_RRVUN_484921_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH||SE (C AND I) |
6 |
03-Jul-2025 11:00 AM |
18-Jul-2025 01:00 PM |
19-Jul-2025 03:00 PM |
[Supply of Premium Make Gear Boxes for Conveyor Drive System in CHP area KSTPS Kota.]
[20222][2025_RRVUN_484614_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
7 |
02-Jul-2025 06:55 PM |
09-Jul-2025 04:00 PM |
10-Jul-2025 11:00 AM |
[Annual Rate Contract (ARC) for supply of Atlas Copco Make Compressor Spares for various power plants of RVUN on Need Basis]
[TN-15/2025-26][2025_RRVUN_484715_1]
|
RRVUN - CMD||RVUN - CE (TD) - Jaipur |
8 |
02-Jul-2025 06:00 PM |
07-Jul-2025 11:30 AM |
07-Jul-2025 03:30 PM |
[SSP-07-ABB-UNIT-03]
[SSP-07-ABB-UNIT3][2025_RRVUN_484678_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
9 |
02-Jul-2025 11:00 AM |
31-Jul-2025 01:00 PM |
01-Aug-2025 03:00 PM |
[Beneficiation of 2.524 Million MT Raw Coal per annum from Korba Field of SECL, Bilaspur, Chhatisgarh for Kota Thermal Power Station of RVUN]
[RVUN_CE_FUEL_05_2025-26][2025_RRVUN_484070_1]
|
RRVUN - CMD||RVUN - Dy.CE (PPC and F) - Jaipur||Ex.En. (Fuel) |
10 |
02-Jul-2025 11:00 AM |
09-Jul-2025 05:00 PM |
10-Jul-2025 11:00 AM |
[Procurement of various type of Rathi make connecting couplings at 2x660 MW SSCTPS , RVUN Suratgarh]
[TN-SC-Prop.-03 (Boiler)/2025-26][2025_RRVUN_484410_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
11 |
02-Jul-2025 11:00 AM |
31-Jul-2025 01:00 PM |
01-Aug-2025 03:00 PM |
[Beneficiation of 2.312 Million MT Raw Coal per annum from Korba Field of SECL, Bilaspur, Chhatisgarh for Chhabra Thermal Power Plant of RVUN]
[RVUN_CE_FUEL_06_2025-26][2025_RRVUN_484156_1]
|
RRVUN - CMD||RVUN - Dy.CE (PPC and F) - Jaipur||Ex.En. (Fuel) |
12 |
02-Jul-2025 09:00 AM |
17-Jul-2025 12:00 PM |
18-Jul-2025 03:00 PM |
[TN-11173 Supply of Eccentric non Lubricated Plug valves of various sizes for unit 1 to 7 at KSTPS, Kota.]
[TN-11173][2025_RRVUN_482634_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
13 |
02-Jul-2025 09:00 AM |
17-Jul-2025 12:00 PM |
18-Jul-2025 03:00 PM |
[TN-15291 Supply of Various Sizes Boiler CDS Tubes/ Pipes for Boiler Stage I to V, Unit 1 to 7 at KSPTS, Kota.]
[TN-15291][2025_RRVUN_482595_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
14 |
01-Jul-2025 06:55 PM |
28-Jul-2025 06:00 PM |
29-Jul-2025 03:00 PM |
[Supply of Industrial Safety Shoes for RVUN Power Stations]
[TN-14/2025-26][2025_RRVUN_484351_1]
|
RRVUN - CMD||RVUN - CE (TD) - Jaipur |
15 |
01-Jul-2025 12:00 PM |
08-Jul-2025 03:30 PM |
08-Jul-2025 04:00 PM |
[SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SPARES FOR BENTLY NEVADA MAKE VIBRATION MONITORING SYSTEM VMS INSTALLED IN CHP CONTROL ROOM, AT KATPP, RVUN, JHALAWAR]
[SE(MM)/CHP/PROP/TN-12][2025_RRVUN_484110_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (E and M)||Ex.En. (CM and C) |
16 |
01-Jul-2025 11:00 AM |
21-Jul-2025 05:00 PM |
23-Jul-2025 03:30 PM |
[Day to Day civil repair and maintenance of residential and Non- residential buildings in DCCPP Colonies, 220 KV GSS Colony and at DCCPP Plant Dholpur]
[TN-02/2025-26/Civil][2025_RRVUN_483801_1]
|
RRVUN - CMD||RVUN - CE (DCCPP) - Dhoulpur||SE - Proc. |
17 |
01-Jul-2025 10:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:00 PM |
[Purchase of L and T make HP Pumps and its Spares for Tube Mill BBD4772 for unit 1 to 4, CTPP,Chhabra]
[NIB-BM-01/25-26][2025_RRVUN_484010_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||Dy.CE (O and M) |
18 |
01-Jul-2025 09:00 AM |
16-Jul-2025 12:00 PM |
17-Jul-2025 03:00 PM |
[TN-20230 Supply of Various Couplings for Conveyor drive system in CHP area at KSTPS, Kota.]
[TN-20230][2025_RRVUN_482590_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
19 |
01-Jul-2025 09:00 AM |
16-Jul-2025 12:00 PM |
17-Jul-2025 03:00 PM |
[TN-13314 Puchase of Guided wave radar type Hotwell and MOT level transmitter, forbay level transmitter installed at KSTPS, Kota.]
[TN-13314][2025_RRVUN_482607_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
20 |
01-Jul-2025 09:00 AM |
16-Jul-2025 12:00 PM |
17-Jul-2025 03:00 PM |
[TN-20227 Supply of galvanized steel wire rope for beetle of WT- 1 and 3 and hoists installed at wagon tippler, rotary, apron and conveyor system in CHP arca KSTPS, Kota.]
[TN-20227][2025_RRVUN_482381_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
21 |
30-Jun-2025 12:00 PM |
15-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[SUPPLY OF PLUMMER BLOCKS at KATPP, JHALAWAR]
[TN-1215(MM)][2025_RRVUN_483722_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (E and M)||Ex.En. (CM and C) |
22 |
30-Jun-2025 11:00 AM |
07-Jul-2025 06:00 PM |
08-Jul-2025 11:00 AM |
[TN/E-Proc/2025-26/Elect-01]
[TN/E-Proc/2025-26/Elect-01][2025_RRVUN_483408_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
23 |
30-Jun-2025 09:00 AM |
21-Jul-2025 12:00 PM |
22-Jul-2025 03:00 PM |
[TN-11174 Supply of spares for ESP of Unit 1 to 7 at KSTPS, Kota.]
[TN-11174][2025_RRVUN_482164_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
24 |
30-Jun-2025 09:00 AM |
21-Jul-2025 12:00 PM |
22-Jul-2025 03:00 PM |
[TN-20225 Requirement of spares for railway track maintenance at KSTPS Railway siding, Kota.]
[TN-20225][2025_RRVUN_482362_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
25 |
28-Jun-2025 12:00 PM |
18-Jul-2025 03:00 PM |
18-Jul-2025 03:30 PM |
[SUPPLY OF PA FANS BLADES AT 2X600 MW, KaTPP, RVUNL, JHALAWAR]
[TN-1209(MM)][2025_RRVUN_482197_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE (MM) |
26 |
28-Jun-2025 12:00 PM |
07-Jul-2025 03:00 PM |
07-Jul-2025 03:30 PM |
[Procurement of Spares of Voith make Hydraulic Coupling of KaTPP, RVUNL, Jhalawar]
[SE(MM)/TM/prop/25-26/TN-06][2025_RRVUN_483544_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE (MM) |
27 |
28-Jun-2025 12:00 PM |
15-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[Supply of Sponge Cleaning Balls (Type RB Hard) of COLTCS system for condenser tube cleaning ]
[TN-1214(MM)][2025_RRVUN_482407_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE (MM) |
28 |
27-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:30 PM |
[Annual contract for handling of store material i.e. loading unloading, cleaning and stacking of items, preparation of SRNs and SINs of store related items and operation of hydra, LCV, diesel pump and weigh bridge etc in KaTPP RVUNL, Jhalawar store.]
[TN-657 /store/2025-26/(E-Tender)][2025_RRVUN_482797_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE (MM) |
29 |
27-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:30 PM |
[Regular maintenance of existing gardens and plants at KaTPP plant site, Jhalawar.]
[TN/CIVIL/07/2025-26][2025_RRVUN_482476_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (Civil)||Ex.En. (Civil) |
30 |
27-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:30 PM |
[Annual maintenance contract for ESP System for 2x600 MW Unit 1 and 2, KaTPP, RVUN, Jhalawar]
[TN-655][2025_RRVUN_482489_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE(CA) |
31 |
27-Jun-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 03:30 PM |
[Day to day repair and maintenance of Joinery works at 2X600MW KaTPP Plant site, Jhalawar.]
[TN/CIVIL/10/2025-26][2025_RRVUN_482481_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (Civil)||Ex.En. (Civil) |
32 |
27-Jun-2025 11:00 AM |
07-Jul-2025 11:00 AM |
08-Jul-2025 03:30 PM |
[Fencing work all around ash dyke at KaTPP, Jhalawar.]
[TN/CIVIL/05/2025-26][2025_RRVUN_482460_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (Civil)||Ex.En. (Civil) |
33 |
27-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:30 PM |
[Day to day repair of Sanitary and water supply fittings at KaTPP Township, Jhalawar]
[TN/CIVIL/08/2025-26][2025_RRVUN_482380_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (Civil)||Ex.En. (Civil) |
34 |
27-Jun-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 03:30 PM |
[ANNUAL CONTRACT FOR CLEANING OF OIL GUNS AND OTHER PLANT OPERATION RELATED WORKS IN UNIT 1 AND 2 (2 X 600 MW) KATPP RVUNL JHALAWAR]
[TN/OPR/658/2025-26][2025_RRVUN_483021_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (E and M) |
35 |
27-Jun-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 03:30 PM |
[Day to day civil maintenance works of KaTPP township, Jhalawar]
[TN/CIVIL/09/2025-26][2025_RRVUN_482406_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (Civil)||Ex.En. (Civil) |
36 |
27-Jun-2025 10:00 AM |
14-Jul-2025 01:00 PM |
15-Jul-2025 03:30 PM |
[Requirement of C and S make spares for LT SWGR, ESP and DC System, River water system and CHP of Unit-I to IV of CTPP Chhabra]
[D-230 Date 26.06.2025][2025_RRVUN_483156_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
37 |
27-Jun-2025 10:00 AM |
14-Jul-2025 01:00 PM |
15-Jul-2025 03:30 PM |
[Supply and ETC of two sets of Exide make battery banks, 220V/2000AH, Tubular (Lead-Acid), HDP-II, SAN container along with accessories, including dismantling and buyback of the existing installed Exide battery banks at CTPP, Chhabra]
[D-232 date 26.06.2025][2025_RRVUN_483191_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
38 |
27-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 03:30 PM |
[Annual contract for Routine Breakdown and Capital maintenance works of 400KV and 220KV switchyard scada system and 3x1500KVA dg set at katpp jhalawar]
[TN 654][2025_RRVUN_482792_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||Dy.CE (E and M) |
39 |
26-Jun-2025 06:00 PM |
07-Jul-2025 04:00 PM |
08-Jul-2025 11:00 AM |
[TN-18330]
[TN-18330][2025_RRVUN_482733_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
40 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[Desilting, cleaning, dewatering and associated works of C.T. Basin of Cooling Tower/forebay of 6X250MW, STPS (Stage-I, II, III, and IV) Unit- 1 to 6.]
[TN-3141(CA)][2025_RRVUN_482163_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE(CA) |
41 |
25-Jun-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 03:00 PM |
[TN-11172 Supply of Alloy CI fittings, Spares for bottom ash hopper and fly ash System of ash handling Plant stage, I to V, Unit 1 to 7, KSTPS, Kota.]
[TN-11172][2025_RRVUN_482160_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
42 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN3137ELECT]
[TN3137ELECT][2025_RRVUN_482010_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||Dy.CE (CHPl) |
43 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN-3139/CHP]
[TN-3139/CHP][2025_RRVUN_482208_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
44 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[Online lube oil reconditioning of Lubrication system of Ball tube Mills in STPS, Suratgarh]
[TN 3140 BM][2025_RRVUN_482401_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
45 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN-3142(OPR)]
[TN3142(OPR)][2025_RRVUN_482073_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (BM) |
46 |
25-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN-3138/MMH]
[TN-3138/MMH][2025_RRVUN_482084_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
47 |
24-Jun-2025 09:00 AM |
08-Jul-2025 12:00 PM |
09-Jul-2025 03:00 PM |
[TN-5413 Providing and fixing of Pre-laminated coloured coated sheet roofing at ESP of Unit 3 and 4 at KSTPS, Kota]
[TN-5413][2025_RRVUN_482039_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
48 |
24-Jun-2025 09:00 AM |
08-Jul-2025 12:00 PM |
09-Jul-2025 03:00 PM |
[TN-5419 Routine, Breakdown and Capital Repair Works of LT Swgr, Cable Cleaning of Stage-I to V and Laying and Termination of Ht/Lt Power and Control Cables of Various Sizes at KSTPS, Kota]
[TN-5419][2025_RRVUN_481786_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (Elect and C and Il)||SE (EM) |
49 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 11:00 AM |
[TN STPS SC 236 Elect]
[TN/STPS-SC/2025-26/236(Elect.)][2025_RRVUN_480680_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
50 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 11:00 AM |
[Annual Contract for Routine, Breakdown and Capital maintenance work of Air Pre Heater, ID, FD and PA Fans and Duct and Dampers for Unit 7and 8, SSCTPS, RVUN, Suratgarh for FY 2025-26.]
[TN/STPS-SC/2025-26/ 231 (Boiler)][2025_RRVUN_481112_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH||SE(MM) |
51 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:30 AM |
09-Jul-2025 11:30 AM |
[Procurement of LRP Condenser Air Evacuation system (Vacuum Pump) installed at Condenser of Unit_7 (660 MW), STPS-SC, Suratgarh]
[TN/STPS-SC/2025-26/PROC/318][2025_RRVUN_480832_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
52 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:30 AM |
09-Jul-2025 11:30 AM |
[PIPE IN PIPE (PIP) For Dense Phase System ]
[TN/STPS-SC/2025-26/PROC/314][2025_RRVUN_480266_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
53 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:30 AM |
09-Jul-2025 11:30 AM |
[REQUIREMENT OF SAFETY, RESCUE and SECURITY ITEMS FOR SSCTPS FY 2025-26 SURATGARH]
[TN/STPS-SC/2025-26/PROC/317][2025_RRVUN_481045_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
54 |
23-Jun-2025 11:00 AM |
15-Jul-2025 11:00 AM |
16-Jul-2025 11:00 AM |
[Annual Contract for Fire Fighting operation of Unit 7 and 8 SSCTPS RVUNL Suratgarh]
[TN-233 (FnS)][2025_RRVUN_481487_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH |
55 |
23-Jun-2025 11:00 AM |
15-Jul-2025 11:00 AM |
16-Jul-2025 11:00 AM |
[TN/STPS-SC/2025-26/ 228(CnI)]
[TN/STPS-SC/2025-26/ 228(CnI)][2025_RRVUN_480502_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH||SE (C AND I) |
56 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 11:00 AM |
[TN/STPS-SC/2025-26/229(BM)]
[TN/STPS-SC/2025-26/229(BM)][2025_RRVUN_480506_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
57 |
23-Jun-2025 11:00 AM |
15-Jul-2025 11:00 AM |
16-Jul-2025 11:00 AM |
[Annual contract for Routine Breakdown Capital Maintenance ]
[TN-234 (FnS)][2025_RRVUN_481557_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH |
58 |
23-Jun-2025 11:00 AM |
15-Jul-2025 11:00 AM |
16-Jul-2025 11:00 AM |
[TN/STPS-SC/2025-26/232(Civil)]
[TN/STPS-SC/2025-26/232(Civil)][2025_RRVUN_480517_1]
|
RRVUN - CMD||RVUN-CE (STPS-SC) SURATGARH |
59 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:30 AM |
09-Jul-2025 11:30 AM |
[Requirement of Mechanical Spares for M/s LnT Make Wagon Tipplers and Side Arm Chargers at CHP, SSCTPP, Suratgarh]
[TN/SSCTPS/2025-26/SE-PROC/321][2025_RRVUN_480650_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||SE (Proc.) |
60 |
23-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 11:00 AM |
[TN/STPS-SC/2025-26/235(Elect)]
[TN/STPS-SC/2025-26/235(Elect)][2025_RRVUN_480866_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||Dy.CE (CHPl) |
61 |
23-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5410 Repair/Reconditioning of old /used mechanical seals and its spares for Boiler Feed Pump and Booster Pump of Unit 3 to 7 of KSTPS Kota]
[TN-5410][2025_RRVUN_481257_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (MM-I) |
62 |
23-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5418 Operation and Maintenance of Air Conditioning System including Central AC System, Package Air Conditioners, Evaporative cooling Plant, Hydrogen Dryer, cooling tower for AC system and repair and reconditioning of Condenser/Chiller of KSTPS, K]
[TN-5418][2025_RRVUN_481635_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (Elect and C and Il)||SE (EM) |
63 |
23-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5412 Repair and maintenance works of Station Lighting, Road and Boundary Lighting and PA System and Desert Cooler, Exhaust Fan and Ceiling Fan Maintenance works of Stage- I to V, KSTPS, Kota ]
[TN-5412][2025_RRVUN_481303_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (Elect and C and Il)||SE (EM) |
64 |
21-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5414 Operation and Maintenance of various machines installed at KSTPS Workshop in CHP Plant of KSTPS, Kota ]
[TN-5414][2025_RRVUN_481249_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (MM-I) |
65 |
21-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5416 Comprehensive annual maintenance contract of HCL/DELL/HP/Acer other make PC, Server, Printer, Scanner, Network Switches and Network Installed for Local Area Network (For internet connectivity) at KSTPS, Kota]
[TN-5416][2025_RRVUN_481044_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
66 |
20-Jun-2025 04:00 PM |
04-Aug-2025 11:00 AM |
05-Aug-2025 01:00 PM |
[Request for Selection for Setting up of 1000 MW/2000 MWh Standalone Battery Energy Systems under Tariff Based Global Competitive Bidding in Rajasthan with Viability Gap Funding Support under BOO model.]
[TN-04/2025-26][2025_RRVUN_479776_1]
|
RRVUN - CMD||RVUN - CE (TD) - Jaipur||SE (TD) |
67 |
20-Jun-2025 09:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 03:00 PM |
[TN-5417 Hiring of 07 Nos buses with driver and conductor ( 32 Seater, model 2022 or latest) 01 no for 16 hrs service and 06 nos for 08 hrs service to transport KSTPS staff and their school going Children for 03 years. ]
[TN-5417][2025_RRVUN_481014_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
68 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2073-cables]
[TN-MM-2073-cables][2025_RRVUN_479094_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
69 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2066/Cooling Tower spares]
[TN-MM-2066][2025_RRVUN_479781_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
70 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2074]
[TN-MM-2074][2025_RRVUN_479792_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
71 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2070-Supply of speed reducer for Air pre Heater 27.5 VIMT 2000 of Unit 6 of 250MW SSTPS, Suratgarh]
[TN-MM-2070][2025_RRVUN_478817_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
72 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2071 Supply of spares of rotary breakers and stacker cum Re-claimer of CHP at SSTPS Suratgarh for 2025-26]
[TN-MM-2071][2025_RRVUN_479815_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
73 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2072/CT PT and Isolators]
[TN-MM-2072][2025_RRVUN_479901_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
74 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2068 Supply of various spares for BEML make BE-71 Hydraulic Excavators at CHP site of SSTPS, Suratgarh for the year 2025-26]
[TN-MM-2068][2025_RRVUN_479805_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
75 |
19-Jun-2025 11:00 AM |
09-Jul-2025 11:30 AM |
10-Jul-2025 11:30 AM |
[TN-MM-2078-Water-Separator]
[TN-MM-2078][2025_RRVUN_479115_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
76 |
16-Jun-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 04:00 PM |
[Requirement of SIEMENS make or equivalent Feeder and COC Clean Out Conveyor gear box for Gravimetric feeders Stock Redller make of Ball Tube Mills BBD4772 of unit 3 and 4, at CTPP Chhabra for FY-2025-26]
[TN-4084/25-26][2025_RRVUN_478873_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
77 |
16-Jun-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 04:00 PM |
[Requirement of various size Hand operated and Motorized valves without actuator and HP valves with spares for Boiler and Turbine area Unit1 to 4,CTPP,Chhabra]
[TN-4083/2025-26][2025_RRVUN_478650_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
78 |
16-Jun-2025 11:00 AM |
14-Jul-2025 11:00 AM |
15-Jul-2025 04:00 PM |
[Supply of MS, SS and Brass Rods for workshop of CHP, CTPP, Chhabra]
[3358/2025-26][2025_RRVUN_476960_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
79 |
16-Jun-2025 11:00 AM |
07-Jul-2025 11:00 AM |
08-Jul-2025 11:00 AM |
[Supply of 6.6 KV Trailing Power Cable for Stacker Reclaimer installed in CHP, CTPP, Chhabra]
[3357/2025-26][2025_RRVUN_476938_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
80 |
16-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 04:00 PM |
[Supply of Radiators and Air or Oil Cooler Assemblies for Locomotives and Hydraulic Power Packs of Equipments of CHP CTPP Chhabra]
[3356/2025-26 ][2025_RRVUN_476759_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
81 |
13-Jun-2025 11:00 AM |
14-Jul-2025 01:00 PM |
15-Jul-2025 11:00 AM |
[Comprehensive Annual Maintenance Contract (CAMC) for Hitachi-Hirel make 2x 80 KVA -2 Sets UPS System installed at Unit# 1 and 2 ( 2x 250 MW),Emerson make 2x 80 KVA -2 Sets UPS System installed at Unit# 3 and 4 ( 2x 250 MW) and Mini UPS System for P]
[653/2025-26/SE(C and I)/CTPP][2025_RRVUN_478064_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
82 |
13-Jun-2025 11:00 AM |
14-Jul-2025 12:00 PM |
15-Jul-2025 04:00 PM |
[Supply of Rubber Items of all the circle of CTPP, Chhabra]
[1362/2025-26][2025_RRVUN_478234_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
83 |
13-Jun-2025 10:00 AM |
08-Jul-2025 01:00 PM |
09-Jul-2025 11:30 AM |
[Rewinding and Repairing work of stator winding with new coil of Insulation Class-F with VPI of 290KW, 6.6KV, 1489 RPM (Make-Marathon) of Instrument Air Compressor Motor-1 of Unit-I and II, CTPP (O and M), Chhabra.]
[NIB No. 652/2025-26/SE(SWGR-Mtc.)/CTPP][2025_RRVUN_477545_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
84 |
12-Jun-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 04:00 PM |
[Supply of Various Sizes of Hose Pipes for Dry Fly Ash Handling System, Unit#1, 2, 3 and 4, CTPP]
[2029/25-26][2025_RRVUN_477021_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
85 |
12-Jun-2025 11:00 AM |
07-Jul-2025 11:00 AM |
08-Jul-2025 04:00 PM |
[Supply of Generic Medicines for Dispensary, CTPP Township, Chhabra for the period of 12 months.]
[2028/25-26][2025_RRVUN_477015_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
86 |
12-Jun-2025 11:00 AM |
16-Jul-2025 11:00 AM |
17-Jul-2025 04:00 PM |
[Supply of Spares for ESP system of Unit#1 to 4, CTPP, Chhabra for FY. 2025-26]
[2026/25-26][2025_RRVUN_477001_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
87 |
09-Jun-2025 05:00 PM |
10-Jul-2025 02:00 PM |
11-Jul-2025 12:00 PM |
[Bi-Annual Contract for Maintenance work of 132KV Switchyard ]
[08/2025-26][2025_RRVUN_476813_1]
|
RRVUN - CMD||RVUN - CE (H and GP) - Jaipur||SE - Generation, Banswara |
88 |
04-Jun-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 03:00 PM |
[TN-14168 Requirement of Refrigeration gases for Air conditioning plant KSTPS, of the year 2025-26.]
[TN-14168][2025_RRVUN_474955_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
89 |
04-Jun-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 03:00 PM |
[TN-16086 Supply of High Pressure water jet pump alongwith accessories for cleaning of condenser tubes of Unit 1 to 7 of KSTPS, Kota.]
[TN-16086][2025_RRVUN_474953_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
90 |
03-Jun-2025 09:00 AM |
08-Jul-2025 12:00 PM |
09-Jul-2025 03:00 PM |
[TN-25140 Supply of Miscellaneous consumables at KSTPS, Kota.]
[TN-25140][2025_RRVUN_472708_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
91 |
02-Jun-2025 09:00 AM |
07-Jul-2025 12:00 PM |
08-Jul-2025 03:00 PM |
[TN-15290 Supply of Ceramic lined component for Bowl Mill XRP- 763/803 of KSTPS, Kota.]
[TN-15290][2025_RRVUN_472540_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur |
92 |
02-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN 3128 CHP]
[TN-3128/CHP][2025_RRVUN_474749_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh||Dy.CE (CHPl) |
93 |
02-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[Renovation of badminton courts at STPS Township]
[TN-3136 (Civil)][2025_RRVUN_474472_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
94 |
02-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 01:00 PM |
[TN-3125/MMH]
[TN 3125/MMH][2025_RRVUN_474806_1]
|
RRVUN - CMD||RVUN - CE (SSTPS), Suratgarh |
95 |
30-May-2025 06:00 PM |
07-Jul-2025 02:00 PM |
08-Jul-2025 03:00 PM |
[TN-09/2025-26]
[TN-09/2025-26][2025_RRVUN_474706_1]
|
RRVUN - CMD||RVUN - Dy.CE (PPC and F) - Jaipur |
96 |
27-May-2025 06:00 PM |
07-Jul-2025 02:00 PM |
08-Jul-2025 03:00 PM |
[TN-08/2025-26]
[TN-08/2025-26][2025_RRVUN_473696_1]
|
RRVUN - CMD||RVUN - Dy.CE (PPC and F) - Jaipur |
97 |
22-May-2025 06:10 PM |
23-Jul-2025 12:00 PM |
24-Jul-2025 02:00 PM |
[Tariff based Competitive Bidding (TBCB) for setting up of new 1100 MW lignite-based thermal power project under DBFOO along with revival of existing 2X125 MW Giral lignite thermal project of RVUNL in Barmer District- Rajasthan ]
[TN-03/2025-26][2025_RRVUN_471874_1]
|
RRVUN - CMD||RVUN - CE (TD) - Jaipur||SE (TD) |
98 |
20-May-2025 12:00 PM |
08-Jul-2025 03:00 PM |
08-Jul-2025 03:30 PM |
[Supply of Spares of PA, FD and ID fans for Boiler, 2X600 MW KaTPP, RVUNL, Jhalawar]
[TN-1205(MM)][2025_RRVUN_470673_1]
|
RRVUN - CMD||RVUN - CE (KaTPP) - Jhalawar||SE (MM) |
99 |
13-May-2025 11:00 AM |
09-Jul-2025 11:00 AM |
10-Jul-2025 11:00 AM |
[Supply of 420KV Wave Trap installed at 2x660MW CSCTPP, Chhabra]
[TN-SC-591/2025-26(MM)][2025_RRVUN_466437_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra||SE (MM) |
100 |
13-May-2025 11:00 AM |
07-Jul-2025 01:00 PM |
08-Jul-2025 03:00 PM |
[Annual Rate Contract for empanelment of transportation agency(s)/contractor(s) for transportation of pond/mound ash from ash pond/dyke of CSCTPP, RVUN, Chhabra to various locations of user agency(s)]
[TN-SC-W-07/2025-26(AHP)][2025_RRVUN_467261_1]
|
RRVUN - CMD||RVUN-CE (CTPP-SC) CHHABRA |
101 |
12-May-2025 11:00 AM |
10-Jul-2025 11:00 AM |
11-Jul-2025 12:00 PM |
[Supply of Various Hoses with End Fittings at CHP CTPP Chhabra]
[3351/2025-26][2025_RRVUN_466389_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
102 |
09-May-2025 06:55 PM |
22-Jul-2025 06:00 PM |
23-Jul-2025 03:00 PM |
[Supply of Fire Tenders for RVUN Power Plants ]
[TN-06/2025-26][2025_RRVUN_466976_1]
|
RRVUN - CMD||RVUN - CE (TD) - Jaipur |
103 |
30-Apr-2025 09:00 AM |
08-Jul-2025 12:00 PM |
09-Jul-2025 03:00 PM |
[TN-13309 Supply of active LEDs display of main control room of Unit 5, KSPTS, Kota.]
[TN-13309][2025_RRVUN_463139_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (MM) |
104 |
22-Apr-2025 09:00 AM |
09-Jul-2025 12:00 PM |
10-Jul-2025 03:00 PM |
[TN-5393 Servicing and Overhauling of 6.6 KV SF-6/Vacuum Breakers installed at KSTPS, Kota]
[TN-5393][2025_RRVUN_459802_1]
|
RRVUN - CMD||RVUN - CE - (TH), KSTPS, Kota, Jaipur||Dy.CE (Elect and C and Il)||SE (EM) |
105 |
17-Apr-2025 11:00 AM |
07-Jul-2025 12:00 PM |
08-Jul-2025 04:00 PM |
[Supply ,Erection, testing and commissioning works for interconnection arrangement (Tie feeder) of 6.6KV Cubical switchgear panels incorporating VCB( Vacuum Circuit breaker rating- 12KV, 3150Amp.,Isc- 40KA at the rate 1sec.) for Phase -I to Phase- I]
[1356/2025-26][2025_RRVUN_456354_1]
|
RRVUN - CMD||RVUN - CE (CTPP) - Chhabra |
106 |
09-Apr-2025 04:00 PM |
22-Jul-2025 05:00 PM |
23-Jul-2025 03:00 PM |
[Tender Notice for Replacement Repairing Capital Overhauling, Refurbishment, Retrofitting with Operation and Maintenance of various mini, micro hydel power stations situated on IGNP]
[RVUN_CE_HGP_01/2025-26][2025_RRVUN_457095_1]
|
RRVUN - CMD||RVUN - Dy.CE (PPC and F) - Jaipur||Ex.En. (Fuel) |
107 |
29-Mar-2025 11:00 AM |
08-Jul-2025 11:00 AM |
09-Jul-2025 11:00 AM |
[Supply of various types of CAF Jointing sheets for Unit 5 and 6, CSCTPP, Chhabra]
[TN-SC-593/2024-25(MM)][2025_RRVUN_455156_1]
|
RRVUN - CMD||RVUN-CE (CTPP-SC) CHHABRA |